Construction progress: The Terra – Hao Nam to 11/10/2018

Construction progress to 11/10/2018 – The Terra -83 Hao Nam project, meeting the construction progress of the project.

Detail:

– High-rise block: Completed construction floor B3. Construction of basement wall B3, open pit floor B2
– Low-rise blocks:
+ The construction of the structure has been completed
+ Plastering are being handed over to other finishing bidder