Construction progress: The Terra – Hao Nam to 11/10/2018

Construction progress until 11/01/2018 – The Terra -83 Hao Nam project, reaching the progress of the construction owner.

Specifically:

– High-rise block: Has been constructed to the 11th floor, rough construction on the 4th floor
– Low-rise block: 8/12 units have been handed over adjacent to Hao Nam facade

Some pictures of the construction site

 