The project includes two 35-story towers with three basement levels, and construction work on the bored pile and diaphragm wall began in May 2024. Currently, the diaphragm wall and guide wall construction have been completed, and the process of mass bored pile construction is underway, reaching 81% of the design volume. Below are some actual images from the project: