Sending...
  • Vietnamese English

Lượt truy cập hôm nay: 642

Lượt truy cập hôm qua: 923

Lượt truy cập tháng: 329546

Tổng truy cập: 3323028

  • Vietnamese English

Progress of the Park City Hanoi project on August 1, 2019

On August 1, 2019, General Director Tran Viet Cuong visited and had a meeting with the supervision consultant team at the construction site. The project meets the requirements and schedule of the Investor. As follows:

Range 1:

-Color of finishing inside and outside walls;

- Installation of aluminum and glass frames, wooden doors

-Installing handrail in and out of the house;

-Pipe, brick, wooden floor;

-Installing air-conditioning equipment;

Range 2 + 3

-Dust, primer inside and outside the house;

-Installing aluminum and glass door frames;

-Installing handrail in and out of the house;

-Pipe, brick, wooden floor;

Execution of M.E

Range 9 + 10 + 11:

-Dust, primer inside and outside the house;

Execution of M.E

Some photos at the construction site

 

 

 

 

Project

Other news