Construction News
- Home
- Event news
- Construction News
On July 16, 19, the project met the requirements and schedule of the investor. As follows:
1. Sample apartment: Completed the model apartment furniture. And CDT organizes sales opening.
2. Complete rough construction:
+ Build to the 17th floor;
+ Placement to the 8th floor;
+ Electrical engineering, fire protection are being deployed to the 12th floor;
3. Structure part:
Concrete placement of post-tensioning beams to 21st floor.
Some pictures of the Project
Project
Other news