As of July 1, 19, the project: PCC1 Thanh Xuan - 44 Trieu Khuc, Thanh Xuan, Hanoi achieved progress as requested by the Owner.
Specifically:
1. Sample apartment: Completed 2 units of interior, are deploying 3 remaining apartments.
2. Complete rough construction:
+ Build to the 14th floor;
+ Placement to the 6th floor;
+ Electrical engineering, fire protection are being deployed to the 9th floor;
3. Structure part:
Concrete placement of Prestressing slab beams to 19th floor.
Some pictures of the Project