On July 11, 2019, The Terra-83 Hao Nam Project achieved the progress and requirements of the investor. As follows:
- Low-rise blocks:
+ Phase I: handed over 11/25 apartments.
+ Phase II: executing the structure: building the roof with 09 units, constructing the remaining 05 units.
- High-rise block:
+ Construction, basic plastering completed on floors.
+ Complete sample apartment
+ Deploying WC tiles and balconies: 70% of volume.
+ Paint baits, gypsum ceiling deployed to 8/13 floors.
+ Prepare to paint outside the house.